{
      "now": "2026-01-19T09:09:10.776Z",
      "expiry": "2026-01-19T09:09:15.053Z"
    }
        

    Lighting

    ARRIVAL

    • Arrive at Church

    • Check Dimmer switch is on

    • Switch on Lighting ppts at backstage and plug in any power to lights/leds

    • Turn on Lighting computer

    • Familiraise yourself with the runsheet noting any special lighting queues.

    REHEARSAL

    • Check lighting cues are working inc/ dimmers

    • check all lights are working by running through a few cues

    • Pump fog to check if workin, reposition fan if moved or pouring into the fron stage

    • Check catwalk dimmer switches havent tripped - if yes, then to switch to on, on catwalk

    • Attend Pre-Brief

    • Lower House lights to P&W levels for Band and Vocal rehearsal

    • Decide on queues to use for each song, make adjustments if required

    • Use queues during rehearsal familiarising yourself with timing etc.

    • House lights up for sound checks and cleaning by GS

    • Leave lights on General queue with colour backdrop

    DURING SERVICE

    • Small & Main stage down for pre-roll

    • Begin lowering house lights to P&W with 1min left on pre-roll

    • Bring Fog in during countdown

    • Bring Main stage right up when pre-roll ends and Connections speak

    • Run lighting queues as decided in rehearsal

    • Listen to producer for any lighting queues they need during service

    AFTER SERVICE

    • After service wait until auditorium is empty before switching lights off (same as arrival)

    • Make Producer aware of any issues encountered for their report

    • Debrief with Tech team after band debrief

    • RESET - Reset everything back to how it should be as default for the next person. 

    OTHER POINTS TO BE AWARE OF

    • Make sure there is always Fog on stage during P&W

    • Connections will step onto small stage after doing their connection

    • Use General lights for Speaking & Preaching moments

    • House lights turned up during welcome time and let up during rest of service

    • House Black for preview, leave back downlights on a bit for GS to see

    • Make Producer aware of any issues encountered for their report